0 ratings
10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))
High quality and long life. Tinker, DIY and hobbyists must!
10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))
Item #: 83482254

10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))

Item #: 83482254

TZS 50498

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from US

0 ratings Write a review
In stock
us Imported from USA store

QTY:

Order now and get it around Wednesday, September 02
Our Top Logistics Partners
  • fedex
  • dhl
High quality and long life. Tinker, DIY and hobbyists must!
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
mobile money payment
sepa payment
Note: Step Down Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

What Stands Out

High Voltage Rating
Rated for 450V, these capacitors provide superior performance in high-stability applications, ensuring reliability in tube amplifiers and other critical electronics.
Generous Capacity
With a capacitance of 100μF, these capacitors enable efficient power storage, improving the overall performance and sound quality of audio equipment.
Versatile Kit
This 5-piece collection includes various long lead capacitors, offering versatility for different builds and repairs, ideal for audio enthusiasts and professional technicians alike.

Product Details

Shop 10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in)) online at a best price in Tanzania. B0CYBHQH4X
Capacitance47 Microfarad
Item ShapeRound
Operating Voltage450 Volts
Capacitance Tolerance20
Maximum Voltage450 Volts
Mounting TypeThrough-Hole Mount
Upper Temperature Rating105 Degrees Celsius
Material TypeAluminum
Item Dimensions W x H0.63"W x 0.98"H (1.6 cm)
Brand NameCermant
ManufacturerCermant
Part NumberCelent_CL230-233
ModelCelent_CL230-233
Unit Count10.0 Count
BrandCermant
MaterialAluminum
ShapeRound
Item Weight0.2 lbs (90 grams)

Who Should Buy?

Suitable For
  • Audio Enthusiasts

    Perfect for DIY tube amplifiers or audio circuit builders looking for reliable capacitors.

  • Electronic Hobbyists

    Ideal for hobbyists who need versatile capacitors for various electronics projects and prototypes.

  • Repair Technicians

    Useful for technicians repairing older audio equipment requiring specific capacitance ratings and voltage specifications.

Not Suitable For
  • Non-Audio Projects

    Not suitable for users who require capacitors for non-audio applications, as specifications may vary greatly.

Product Description

10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))

Have any Query? Chat with us

Customer Questions & Answers

  • Question: What applications are suitable for 450V 22UF electrolytic capacitors?

    Answer: The 450V 22UF electrolytic capacitors are ideal for tube amplifiers and power supply circuits. Their high voltage rating makes them suitable for applications in audio amplification where stability and performance are crucial. In audio circuits, these capacitors help maintain signal integrity and prevent noise interference, ensuring high-quality sound output.
  • Question: What are the dimensions of the 450V 22UF capacitors?

    Answer: Each capacitor in the kit measures approximately 13mm in diameter and 20mm in length. This compact sizing allows for easy integration into various electronic projects without taking up excessive space, making them suitable for both DIY enthusiasts and professionals working on audio equipment or high-voltage applications.
  • Question: What is the significance of long leads on capacitors?

    Answer: Long leads on capacitors provide flexibility during installation, allowing users to easily solder them onto printed circuit boards or prototype designs. This design feature is particularly beneficial for projects where precise positioning is necessary, facilitating better layout management in tight spaces or complex circuitry.
  • Question: Are 22UF capacitors polarized?

    Answer: Yes, the 22UF capacitors in this kit are polarized electrolytic capacitors. This means they must be installed in the correct orientation within the circuit, respecting the positive and negative leads. Incorrect installation can lead to capacitor failure or damage to the circuit, so it is important to pay attention to the polarity markings during installation.
  • Question: How can I determine the lifespan of these capacitors?

    Answer: The lifespan of electrolytic capacitors like these typically depends on factors such as application voltage, temperature, and load conditions. Operating below the rated voltage and in cooler environments can significantly extend their life. Frequent use in high-temperature applications may shorten their lifespan, making it essential to monitor conditions in circuits where they are employed.
  • Question: What is the typical frequency response for capacitors of this type?

    Answer: These capacitors generally offer good frequency response across audio applications, making them suitable for filtering and coupling tasks in tube amplifiers. Their ability to handle high frequencies effectively contributes to better audio quality, ensuring minimal signal distortion and a clear sound output.
  • Question: Can I use these capacitors for non-audio applications?

    Answer: Absolutely! While they are excellent in audio applications, the 450V 22UF capacitors can also be used in various other electronic circuits, such as in power supply smoothing and decoupling applications. Their versatility makes them a valuable addition to any electronics toolkit.
  • Question: What voltage rating is considered safe for these capacitors?

    Answer: For optimal performance and safety, it is recommended to operate these capacitors at voltages below their 450V rating. A common rule of thumb is to utilize them at around 70-80% of their rated voltage, which can enhance durability and reduce risks of capacitor failure due to voltage spikes.
  • Question: What does a capacitor kit typically include?

    Answer: A capacitor kit like this typically includes multiple capacitors of the same specification, including the 450V 22UF rating. Such kits provide a versatile solution for electronics projects, offering various capacitor quantities for different circuit designs, helping to ensure you have enough components for prototypes and repairs.
  • Question: Where can I buy a 10pcs 450V 22UF Capacitor Kit in Tanzania?

    Answer: You can purchase the 10pcs 450V 22UF Capacitor Kit from Ubuy. They offer a wide selection of electronic components, including this capacitor kit, catering to various projects whether you are a hobbyist or a professional in electronics. Ubuy provides convenience through an online platform, making it easy to find and order the components you need.

Cermant Capacitors Editorial Review

The Cermant 10pcs 450V 68UF Capacitors have garnered positive feedback from customers, particularly for their effectiveness in electronic repairs and projects. Many users have highlighted the excellent performance of these high-frequency aluminum electrolytic capacitors, noting their reliability as replacements in various circuit applications. One satisfied customer shared a personal success story about using these capacitors to revive their 70” TV after a thunderstorm damaged the original components. The direct replacement not only restored the TV to functionality but also left them "couldn’t be happier" with the outcome. Similarly, enthusiasts working on older equipment, such as a 1960s Gonset SSB exciter/transmitter, reported that these capacitors handled full voltage perfectly, making them a valuable asset in restoration projects. Users have also appreciated the quality versus price ratio, with remarks about the fair pricing and the performance of the capacitors being cited as a great deal. Many feedback entries emphasize that there have been no problems reported while using these components, demonstrating their reliability across different applications. In summary, customers are highly satisfied with the Cermant Capacitors, finding them to be reliable, effective, and worth the investment for both repairs and projects. **

Customer Reviews & Ratings

1 customers ratings
  • 5 Star
    100%
  • 4 Star
    0%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Pros

  • High performance and reliability as replacements
  • Positive user experiences in repairs and restoration
  • Good value for price
  • Low leakage characteristics
  • Effectively meets expected specifications

Platform Trust & Buyer Confidence

trustpilot logo
4.2/5 9250 + reviews
Read reviews
MA
Mohammad
Verified buyer

“Excellent quality and original too,when ubuy send original things I will appreciate that ,I very satisfied thank you”

23 July 2026 · via Trustpilot
CK
Chitra
Verified buyer

“The order and delivery progress was communicated very well. Package arrived within the estimated time. Products arrived as expected in good condition.”

22-Jul-26 · via Trustpilot
K
kund
Verified buyer

“Good supply of products. Safe payment methods, and shipment worldwide! Genuine products.”

23-Jul-26 · via Trustpilot
OO
Onesi
Verified buyer

“Was my first time buying a product from Ubuy, but I found it so helpful. This is reliable. Gonna place a new order!”

22 July 2026 · via Trustpilot
SJ
SAO JOHN
Verified buyer

“Ubuy is a great online platform to buy stuff. Reliable, fast delivery time and great value for money. I've been using Ubuy online shopping platform for three years now and will continue to do so.”

23 July 2026 · via Trustpilot
Secure Checkout Global Delivery Easy Returns Genuine Products

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.