0 ratings
100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Anode Diffused Round Lens 29mm Long Lead 300pcs Resistors for DC 6-12V Included,Light Emitting Diodes
Illuminate your projects with our 100pcs RGB Tri-Color LED Diodes, complete with resistors for effortless integration!
100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Anode Diffused Round Lens 29mm Long Lead 300pcs Resistors for DC 6-12V Included,Light Emitting Diodes
Item #: 102255765

100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Anode Diffused Round Lens 29mm Long Lead 300pcs Resistors for DC 6-12V

Item #: 102255765

TZS 46914

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from US

0 ratings Write a review
In stock
us Imported from USA store

QTY:

Order now and get it around Saturday, September 05
Our Top Logistics Partners
  • fedex
  • dhl
Illuminate your projects with our 100pcs RGB Tri-Color LED Diodes, complete with resistors for effortless integration!
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
mobile money payment
sepa payment
Note: Step Down Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

What Stands Out

Warm White Glow
These 5mm LEDs emit a warm white light that enhances ambiance, making them perfect for home decor, craft projects, and decorative lighting.
Complete Kit
The package includes 100 LED diodes and 100 compatible resistors, providing everything needed for easy integration into various electronic and lighting projects.
Versatile Compatibility
Designed to operate at DC 3V with provided resistors for DC 6-12V, these LEDs can be used in a wide range of applications, from model building to holiday decorations.

Product Details

Shop 100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Anode Diffused Round Lens 29mm Long Lead 300pcs Resistors for DC 6-12V Included,Light Emitting Diodes online at a best price in Tanzania. B077XD5T8P
Item Weight0.4 lbs (180 grams)

Who Should Buy?

Suitable For
  • Hobby Electronics

    Perfect for hobbyists building small electronic projects requiring colorful indicator lights or effects.

  • DIY Projects

    Ideal for DIY enthusiasts looking to create custom lighting solutions in various home or craft projects.

  • Educational Use

    Useful for students or teachers in electronics courses focusing on practical applications of LED technology.

Not Suitable For
  • Professional Installations

    Not suitable for commercial-grade installations where high durability and reliability are essential.

  • High-Power Uses

    Not ideal for applications requiring bright lighting under high-energy conditions beyond specified voltage ranges.

  • Outdoor Applications

    Unsuitable for outdoor projects due to potential vulnerability to moisture and weather conditions.

Product Description

100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Anode Diffused Round Lens 29mm Long Lead 300pcs Resistors for DC 6-12V Included,Light Emitting Diodes

Have any Query? Chat with us

Customer Questions & Answers

  • Question: What is the voltage requirement for these LEDs?

    Answer: The red LEDs require DC 2.0-2.2V, while blue and green LEDs require DC 3.0-3.2V.
  • Question: Are resistors included with the LED diodes?

    Answer: Yes, the package includes 300pcs of resistors for seamless integration.
  • Question: What is the viewing angle of these LED diodes?

    Answer: The LED diodes have a wide viewing angle of 120°.

EDGELEC Surface Emitting LEDs Editorial Review

No editorial reviews found

Customer Reviews & Ratings

5.0
1 customers ratings
  • 5 Star
    100%
  • 4 Star
    0%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Platform Trust & Buyer Confidence

trustpilot logo
4.3/5 9,000 + reviews
Read reviews
MT
Mohd
Verified buyer

“The product received very good packaging & safe…Thank You”

16 June 2026 · via Trustpilot
SJ
Shawati
Verified buyer

“Accurate delivery timing given”

16 June 2026 · via Trustpilot
YB
Youcef
Verified buyer

“Not madly expensive like I thought, and much quicker than promised.”

15 June 2026 · via Trustpilot
LM
Leila
Verified buyer

“Never dealt with Ubuy before, but everything worked out great. Seamless cross border purchasing and shipping. Thanks!”

6/7/2026 · via Trustpilot
KA
Kwame
Verified buyer

“The process was smooth, with clear communication and timelines. This was my 1st purchase and I am really impressed. I will definitely be coming back.”

12 June 2026 · via Trustpilot
Secure Checkout Global Delivery Easy Returns Genuine Products

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.